PROJECTS

Print
 Studies, design and supervision of telemetry and tele-control systems 
  •  Phases I and II  Studies of comprehensive telemetry system of water supply in Mashhad city (javadol aeme Project)
  •  Supervision on telemetry system of water and wastewater structures in Mashhad city (javadol aeme Project)
  •  Phases I and II Studies of telemetry Water Supply to Birjand city
  •  Design and operation of telemetry system of water supply structures to Khomein city using EPC method (in cooperation with Zarrin Samaneh Shargh Co.)
  •  Phases I and II studies of remote control telemetry plan and Water Supply plan using GIS in Bandar Torkaman
  •  Phases I and II studies of remote control telemetry plan and Water Supply plan using GIS in Gomishan
  •  Phases I and II studies of remote control telemetry plan and Water Supply plan using GIS in Kordkouy
  •  Preparation of tender documents (designing,setup,delivery,operation for one year )Telemetri system in Aliabad city.
  •  Preparation of tender documents (designing,Setup,delivery,operation for one year )Telemetri system in Galikesh city.
  •  Preparation of tender documents (designing,Setup,delivery,operation for one year )Telemetri system in Minoodasht city.
  •  Telemetry studies for Nazarabad , Mohamad shahr, and Meshkin dasht (Alborz Province)
  •  Phases I and II Studies of telemetry Water Supply to Gojegi, Mashhad
You are here:   HOMEProjectsTelemetry